翻訳と辞書 |
Nanjing–Hangzhou Passenger Railway : ウィキペディア英語版 | Nanjing–Hangzhou Passenger Railway The Nanjing–Hangzhou Passenger Railway () is a high-speed rail (maximum speed 350 km/h), passenger-dedicated line in eastern China between Nanjing (shorthand name ''Ning'') and Hangzhou, the capitals of Jiangsu and Zhejiang provinces, respectively. During the planning and early construction stage, the railway was originally referred to as the Nanjing–Hangzhou Intercity Railway or Ninghang Intercity Railway ().〔(Chinese) (年底南京到杭州坐高铁只需50分钟 ) March 4, 2011〕 Recent publications don't use the "intercity" designation anymore, perhaps in recognition of the fact that the railway will be used not only by local trains but by long-distance trains as well. The line is 249 km long (including 147 km in Jiangsu and 102 km in Zhejiang) and has 11 stations: Nanjing Station, Jiangning District, Lishui County, Liyang, Yixing in Jiangsu and Changxing County, Huzhou South, Deqing County, Yuhang District and Hangzhou East in Zhejiang.〔 The line is the first direct railway between Nanjing and Hangzhou and reduced travel time by rail from nearly two hours to 50 minutes as direct trains no longer need to travel through Shanghai.〔 Construction began in 2008 and the line was opened on July 1, 2013. ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Nanjing–Hangzhou Passenger Railway」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|